OCTOBER 2014
"This is the second Season we are operating the Chiller Plant with the LEEF Panel. The overall system is extremely user friendly allowing my Engineering Staff to change set points. There are detailed graphics that allow a better overview of each specific system operating via the LEEF panel. The LEEF panel is easily upgraded to allow additional applications."

~ Steve Gallagher, Chief Engineer, The Chanin Building, NY NY




Copyright © 2024 Industrial Cooling Inc. All Rights Reserved